HomeMy WebLinkAbout91-123
I~ .V"'~
"\' .
II '4V &:.^J:.L.4l
.
1I1CROFlLMED
',.1-:21445 BK 1883 PG 834
o~FICIAL RECORDS OF MoHAVE COUNTY AI.
*JOAN McCALL, MOHAVE COUNTY RECOROER*
05/02/91 4:0~ P.M. PAGE 1 OF ~
MOHAVE COUNTY BOARD OF SUPERVISORS
RECORDING FEE 0.00 HC
RESOLUTION NO. 91-123
A RESOLUTION SETTING FORTH APPROVAL OF A FINAL SUBDIVISION PLAN
FOR RIO CAMINO, TRACT 4123, BEING THE SE~ NE~ NW~ SECTION 23,
TOWNSHIP 19 NORTH, RANGE 22 WEST, LOCATED IN THE SOUTH MOHAVE
VALLEY, MOHAVE COUNTY, ARIZONA
WHEREAS, at the regular meeting of the Mohave County Board
of Supervisors held on May 1, 1991, a public hearing was
conducted to determine the approval of the final subdivision plan
for Rio Camino, Tract 4123, and
WHEREAS, this subdivision consists of ten (10) acres to be
divided into thirty-four (34) lots.
It is the division of the
SW~ NE~ NW~ Section 23, Township 19 North, Range 22 West, and
WHEREAS, the developer is Advanced Development (Gary Cecil
of Bullhead City, Arizona.
The design and engineering are by
Stovall Engineers, Inc., Fort Mohave, Arizona, and
WHEREAS, the southern boundary and access is Camino
Colorado.
Portions of Camino Colorado, between this tract and
Highway 95, have been dedicated. The remainder are committed for
granting or dedication with this tract or prior to it's
recording, and
~
.r ,
. Resolution No. 941J23
IE
BK
Page 2
2.0F ~
1883 PG 835 (FEE~91-21~~5)
WHEREAS, the approval of this subdivision is based on the
understanding that all streets within the subdivision will be
constructed with inverted crowns and paved with asphaltic
concrete in accordance with Standard Specifications #171 and
#101.10D or better; the streets will include curb and gutter; a
water supply and distribution system including fire flow will be
constructed to serve each lot; grading and drainage related
improvements will be made as recommended by the design engineer
in the submitted drainage reports; arrangements will be made to
extend underground electric and telephone service to each lot in
accordance with Arizona Corporation Commission Regulations; lot
purchasers will utilize individual sewage disposal systems as
approved by the Arizona Department of Environmental Quality; all
lots and street centerline monuments will be staked and
monumented in accordance with Standard Specification #102; fire
hydrants will be provided at locations prescribed by the Fort
Mojave Mesa Fire Department; street name and regulatory signs
will be installed in accordance with the requirements of the
Mohave County Subdivision Regulations and as recommended by the
design engineer and as a condition of approval, a designation
sign shall describe the street as LOOP or DEAD END; the
owner/subdivider
is
responsible
for
the
completion
of
improvements and shall provide an assurance for all required
subdivision improvements in accordance with Article V of the
Subdivision Regulations, and
WHEREAS,
reviews have been received from the County
Engineer, the County Treasurer, Mohave County Health Department,
~
",.~
" Resolution No. 9.23
_E
BK
Page 3
3 OF -4
1883 PG 836 (FEE~91-21+45)
Arizona Department of Environmental Quality, Arizona Department
of Water Resources, Citizens Utilities, Bermuda Water Company and
incorporated into the evaluation of this final tract, and
NOW THEREFORE BE IT RESOLVED, that the Board approves the
said Final Plan conditioned to the following:
1. The developer will make the same commitment for
improvements in the Subdivision Questionnaire to the
Real Estate Commission as required for approval of this
tract by the Board.
2. Arizona Department of Environmental Quality approved
the water supply and distribution system. The water
distribution system will be designed and constructed in
accordance with Arizona Department of Environmental
Quality standards and requirements. The water system
is designed to provide for future fire flows. Fire
hydrants conforming to the minimum County standards
shall be provided and located no more than seven
hundred fifty (750') feet apart and/or fire hydrants
acceptable to the Fort Mojave Mesa Fire Department at
the location(s) they prescribe.
3. Arizona Department of Environmental Quality approved
the use of individual sewage disposal systems for this
subdivision.
4. Arizona Department of Water Resources determined that
there is an adequate water supply to serve this
subdivision.
5. The final plat for Tract 4123, including the
dedication, will need to be properly executed andJC)r
ratified ~ all parties having any record title
interest in the land being subdivided and included on
this subdivision.-
6. The Improvements Costs data sheet shall include
facilities for telephone and electric, drainage, lot
monumentation and construction staking, inspections,
and testing.
7. As-builts shall be submitted that meet the requirements
and approval of the County Engineer.
8. Revised CC&R' s shall be submitted incorporating
provisions for perpetual maintenance of the six (6')
foot block wall at the rear of all exterior lots in
Block 1.
~
.,Jii
, Resolution No. 9~23 ... Page 4
'E 4 OF 4
BK 1883 PG 837 (FEEt91-21445)
9. The thirty (30') foot width right-of-way of Camino
Colorado north of the Riverside Adventure Trails'
parcel shall be acquired and the dedication referenced
to record on the final plat.
10. The reference to the instrument abandoning or
extinguishing the twenty-five (25') foot ingress/egress
easement along the north boundary as required by Board
Resolution No. 90-343, shall be noted on the plat.
11. Requisite comments as per Public Works letter dated
March 11, 1991 shall be complied with.
12. The improvement plans shall show details for the six
(6') foot high perimeter block wall and drainage ditch
along the north boundary of the site. Supporting data
on the drainage ditch's capacities shall also be
submitted.
13. The zoning, as defined in Board Resolution No. 90-344,
shall go into effect with the recording of this plat.
NOW THEREFORE BE IT FURTHER RESOLVED, upon receipt of, or
evidence that these conditions have been met, together with the
executed mylars and appropriate recording fees, the Director of
Planning and Zoning will obtain the necessary signatures from the
County Departments and officials and cause the final plat to be
recorded.
NOW THEREFORE BE IT FURTHER RESOLVED, that notice of hearing
has been met and published throughout this subdivision process
and the public was afforded notice of this final action through
advertisement of the Board of Supervisors' meeting for this date.
MOHAVE COUNTY BOARD OF SUPERVISORS
a;~ 1 /W</ ~r/I
Lois J. Hubbard~ Chairman