RESOLUTION NO. 93-247
A RESOLUTION SETTING FORTH AN EXTENSION OF TIME FOR THE APPROVED
PRELIMINARY SUBDIVISION PLAN OF BEAVER DAM RESORT, TRACT 3015,
BEING A SUBDIVISION OF A PORTION OF SECTION 5, TOWNSHIP 40 NORTH,
RANGE 15 WEST, LOCATED IN THE LITTLEFIELD/BEAVER DAM PORTION OF
THE ARIZONA STRIP AREA, MOHAVE COUNTY, ARIZONA.
WHEREAS, at the regular meeting of the Mohave County Board
of Supervisors held on September 7, 1993, a public hearing was
conducted to determine the approval of an Extension of Time for
the approved Preliminary Subdivision Plan of BEAVER DAM RESORT,
Tract 3015, and
WHEREAS, the owner/developer of this tract is G. R. Frisby
of Beaver Dam, Arizona. The engineer responsible for the
preparation and design of this subdivision was Phylip Leslie,
P.E., Rowley-Leslie Associates, Cedar City, Utah. The drainage
study for the Beaver Dam Wash was prepared by Frank R. Liebrock
and Hooper Knowlton, Jr., P.E.s, with AlE Intra Group, Inc., Salt
Lake City, Utah, and
WHEREAS, this proposed subdivision is located in the Arizona
Strip, approximately one mile north of the I-1S/Littlefield
interchange along County Route 91. The subject parcel is bounded
by County Route 91 to the west and the Virgin River to the north.
Access is provided to this proposed subdivision by County Route
91, a County Highway, and
WHEREAS, this proposed subdivision as submitted and reviewed
is a 32-acre parcel subdivided into 206 park model and RV lots,
33 twin home lots (66 units), and an 11-acre common area and golf
course to be owned and maintained by the owner/subdivider, and
WHEREAS, in a letter dated May 4, 1993, received by Planning
and Zoning on May 11, 1993, Mr. Bob (G. R.) Frisby, the
owner/developer, states, "As you may be aware we have been
seeking approval for construction of Phase II. However, repeated
delays by ADEQ Groundwater Permits have been costly from a time
standpoint". In his letter dated July 8, 1993, received by fax
on July 8, 1993, Mr. Frisby further states, "Beaver Dam Resort
has been working to satisfy these requirements and fully expects
all approvals in the next few weeks," and
..,
.
.
RESOLUTION NO. 93-247
Page 2
PAGE 2 OF 3
BK 2280 PG 359 (FEE~93-52081)
WHEREAS, Article 3.10 states, "Upon application to the
Commission and prior to the expiration of the time limit,
extensions in increments of one year may be granted by the Board
if the subdivider is actively processing the Final Plat. If such
action is not taken, then all proceedings relating to the plat
shall be terminated," and
WHEREAS, the Preliminary Subdivision plan was approved by
the Mohave County Board of Supervisors on July 6, 1987, via P&ZC
Resolution No. 87-100, and
WHEREAS, BOS Resolution No. 91-260 brought the project into
compliance by granting a third Extension of Time, effective until
July 6, 1992. This Extension of Time was conditional upon the
submitted Plat being brought up to the current code. On May 20,
1992, BOS Resolution No. 91-260 was amended by the Board of
Supervisors via a Minute Entry action at the request of Mr.
Frisby. This amendment removed the requirement that the
submitted Plat be brought up to current standards, and
WHEREAS, BOS Resolution No. 92-251 granted the fourth
Extension of Time, to be effective until July 6, 1993, and
WHEREAS, this will be the fifth Extension of Time, and
WHEREAS, at the public hearing
Planning Commission on August 11,
recommended conditional approval of the
Time subject to the following conditions:
before the Mohave County
1993, the Commission
requested Extension of
1. Compliance with all conditions stated below as set
forth via Board of Supervisors action on May 20, 1992
(see attached Exhibit "A") which amended BOS Resolution
No. 91-260.
A. Provision of required financial assurances.
B.
Provision
estimates.
of
acceptable
construction
cost
c. Provision of evidence of approval by ADEQ of the
proposed sewage disposal system.
2. This Extension of Time will be in effect until July 6,
1994, and
RESOLUTION NO. 93-247
Page 3
PAGE 3QF 3
~K 2280 PG 360 (FEE*93-520S1)
NOW THEREFORE BE IT RESOLVED, that notice of hearing has
been met and publiShed throughout this subdivision process as
required by Arizona Revised Statutes and Mohave County
Regulations, and the public was afforded notice of this action
through advertisement of the Board of Supervisors meeting for
this date.
NOW THEREFORE BE IT FURTHER RESOLVED, that the Board of
Supervisors, at their regular meeting on Monday, September 7,
1993, approved this extension of time for the Preliminary Plan of
BEAVER DAM RESORT, Tract 3015, as recommended by the Mohave
County Planning and Zoning Commission and outlined herein.
MOHAVE COUNTY BOARD OF SUPERVISORS
~X'7 4~/(<r,?L~
Sam Standerfer, Chairman .