A RESOLUTION SETTING FORTH AN EXTENSION OF TIME FOR A REZONE OF A
PORTION OF THE NE'Ia OF SECTION 27, TOWNSHIP 18 NORTH, RANGE 22 WEST, FROM
A-R (AGRIcUL TURAL.RESIDENTIAL) AND c-2 (GENERAL COMMERCIAL) ZONES TO C.
RE (COMMERCIAL-RECREATION) ZONE IN THE SOUTH MOHAVE VALLEY AREA,
MOHA VE COUNTY, ARIZONA.
WHEREAS, at the regular meeting of the Mohave County Board of Supervisors held on May I,
1995, a public hearing was conducted to determine whether approval should be granted for an Extension of
Time for a Rezone for the above described property as requested by Gem Land Company of Phoenix,
Arizona, being represented by Stovall Engineers of Bullhead City, Arizona, and
WHEREAS, the site is located eight miles south of Bullhead City and west of Highway 95. The
parcel is accessed directly from Highway 95, then west on King Street, and
WHEREAS, the original rezone request for this site was approved by the Mohave County Board
of Supervisors on January 3,1994 via BOS Resolution No. 94-5, and
WHEREAS, at the present time, the golf course has been constructed and is in use; however, not
all of the conditions ofBOS Resolution No. 94-5 have been met. The remaining conditions of Resolution
No. 94-5 that still need to be met are a parcel plat/site plan, drainage report, documentation from the
authority of the pipeline easement and the necessary ADOT permits for access from Highway 95 as
indicated by Exhibit "A" of Resolution No. 94-5, and
WHEREAS, initially on February 17, 1995, the Zoning Manager sent a letter to Stovall Engineers
notifYing them of noncompliance to all the conditions of Resolution No, 94-5. An Extension of Time was
requested by Stovall Engineers in a letter dated February 27, 1995. In the letter Stovall Engineers states
"due to illness of the previous engineer, Stovall Engineers, Inc. has been retained to complete the project.
The owner/developer was not aware of the conditions or expirations until February 17, 1995, in a letter that
was received from Tom Aragon, Zoning Manager", and
WHEREAS, this will be the first Extension of Time. This extension was not applied for until March
1995, two months after the original rezone had expired. Planning staff considers a six-month extension
more than enough time for the developer to submit the necessary items in order to comply with Resolution
No. 94-5, and
. -
.
.
y
RESOLUTION NO. 95-176
Page 2
PAGE :2 OF 2
6K 2~62 PG B09 (FEE.9~-230+0)
WHEREAS, at the public hearing before the Mohave County Planning and Zoning Commission on
April 12, 1995, the Commission recommended APPROVAL for an Extension of Time for a Rezone subject
to the following:
1. Continued compliance with all the conditions ofBOS Resolution No. 94-5.
2. This Extension of Time will be in effect until August 4, 1995.
WHEREAS, the notice of hearing was published in the Kingman Daily Miner, a newspaper of
general circulation in Kingman, Mohave County, Arizona, April 16, 1995, and posted April 14, 1995, as
required by Arizona Revised Statutes and the Mohave County Zoning Regulations.
NOW THEREFORE BE IT RESOLVED, that the Board of Supervisors, at their regular meeting
on Monday, May 1, 1995, APPROVED this Extension of Time for a Rezone as recommended by the
Mohave County Planning and Zoning Commission and outlined herein.