Loading...
HomeMy WebLinkAbout95-403 I} "0'7' . . Ml~HOfJlMED INDEXED 95052134 BK 2630 PG 605 OFFICIAL RECORDS OF MOHAVE COUNTY, AZ JOAN MC CALL, MOHAVE COUNTY RECORDER 10/05/95 0~:14P PAGE 1 OF 2 MOHAVE COUNTY BOARD OF SUPERVISORS REORDIHG FEE 0.00 RESOLUTION NO. 95-403 A RESOLUTION SETTING FORTH AN EXTENSION OF TIME FOR THE APPROVED PRELIMINARY SUBDIVISION PLAN FOR AZTEC VILLAS, TRACT 4065, BEING A PORTION OF THE E'h SEJ4 NWJ4 OF SECTION 23, TOWNSHIP 19 NORTH, RANGE 22 WEST, IN THE SOUTH MOHA VE VALLEY AREA, MOHA VE COUNTY, ARIZONA. WHEREAS, at the regular meeting of the Mohave County Board of Supervisors held on October 2, 1995, a public hearing was conducted to determine whether approval should be granted for an Extension of Time as requested by representative G. Kelly Grier of Stovall Engineers, Inc. of Bullhead City, Arizona, and WHEREAS, the subdivision is located east of Highway 95, north of Aztec Road and west of Calle Del Media. The site is accessed from Highway 95 via Aztec Road, then east to the site, and WHEREAS, the surrounding land uses consist of single-family residential subdivisions and vacant land, and WHEREAS, the Preliminary Plan depicts 20 acres subdivided into 67 single-family lots, ranging in size from 8,000 square feet to 17,000 square feet. The engineer of record for the subdivision is Stovall Engineers, Inc. of Bullhead City, Arizona, and WHEREAS, the Preliminary Plan for this tract was approved by the Mohave County Board of Supervisors on March 9, 1992, per BOS Resolution No. 92-66. The first Extension of Time was granted on June 6,1994, per BOS Resolution No. 94-167. The Final Plat approval was granted on July 6,1992, per BOS Resolution No. 92-245, and WHEREAS, a letter dated June 7,1995, from Stovall Engineers quotes the following: "Due to difficulties in obtaining right-of. way on Calle del Media and lack of availability of sewer for this project, the owner decided to do the project in Phases. A Phasing Plan was submitted to the County on June 20, 1994. At this time a Final Plat for Phase A was also submitted and has been in the County review process. We are currently working on the resolution of comments from the Public Works Department. The first phase would be on dry sewer, while subsequent phases would be hook[ed]-up to the sewer system, The original Final approval was based on individual septic systems. Per our telephone conversation this afternoon, I offer the following dilemma: The original Final Plat has been approved, and there has been an unresolved question, with a previous staff member, of whether or not a Time Extension would be dated from the Preliminary, or from the Final Approval. Last year, we submitted and received approval for an Extension of Time in June (coinciding with the submittal of the Phased Final Plat), however the expiration date in the resolution was set for March 9, 1995", and . '~ . RESOLUTION NO. 95-403 ' . PAGE 2 OF 2 Page 2 BK 2630 PG 606 FEE~9505213~ WHEREAS, because the Final Plat for this tract was never recorded and the developer has submitted a new Final Plat and a phasing plan, an Extension of Time for the approved Preliminary Plan is required. The date of extension is based on the date of the original Preliminary approval, which is March 9, and WHEREAS, the Mohave County Public Works Department requires compliance with current requirements, compatibility with drainage and circulation patterns of recent nearby development, and WHEREAS, this will be the second Extension of Time, and WHEREAS, the following described Findings of Fact are for the above captioned item: a. All notices have been advertised and posted according to regulations. b. The proposed action complies with the Mohave County General Plan, and the property is designated as an Urban Development Area. c. The site is adequate for the action intended and the use is consistent with the surrounding land uses. d. This request for an extension complies with the Extension of Time Policy. WHEREAS, at the public hearing before the Mohave County Planning and Zoning Commission on September 13, 1995, the Commission recommended APPROVAL for an Extension of Time subject to the following: I. Compliance with all conditions ofBOS Resolution Nos. 92-66 and 94-167. 2. This Extension of Time will be in effect until March 9,1996. WHEREAS, the notice of hearing was published in the Kingman Daily Miner, a newspaper of general circulation in Kingman, Mohave County, Arizona, September 17, 1995, and posted September 15, 1995, as required by Arizona Revised Statutes and the Mohave County Zoning Regulations. NOW THEREFORE BE IT RESOLVED, that the Board of Supervisors, at their regular meeting on Monday, October 2, 1995, APPROVED this Extension of Time as recommended by the Mohave County Planning and Zoning Commission and outlined herein. MOHA VE COUNTY BOARD OF SUPERVISORS ~~b Pat Holt, Chairman