HomeMy WebLinkAbout1995-02 1-) • yp,wuH'°�Fco MICROFILTICIDEREa M< 950 4773 1 BK 2620 PG 341
.
OFFICIAL RECORDS OF MOHAVE COUNTY, AZ
JOAN MC CALL, MOHAVE COUNTY RECORDER
09/11/95 03:45P PAGE 1 OF 2
ORDINANCE NO. 95-2 MOHAVE COUNTY BOARD OF SUPERVISORS
RECORDING FEE 0.00
An Ordinance of the County of Mohave adopting provisions of Bullhead City Ordinance 94-699,
WHEREAS,the County of Mohave is required to subcontract with Bullhead City for delivery
of Colorado River water to the Davis Camp area under Bullhead City's contract with the United
States of America, and
WHEREAS,under that Agreement the County of Mohave is required to report and manage
the amount of water diverted for their use for ultimate reporting to the Bureau of Reclamation by
Bullhead City, and
WHEREAS,failure to report could constitute grounds for termination of the contact between
Bullhead City and the United States of America and the subcontract involving Mohave County,
THEREFORE, BE IT ORDAINED AS FOLLOWS: WHEREAS:
Enacting the following provisions of Bullhead City Ordinance 94-699 as modified herein
as and for Ordinances of Mohave County for the limited purpose of complying with the requirements
of Contract No.2-07-30-W0027 between the City of Bullhead City and the United States of America
under which Mohave County is a subcontractor.
Water Allocations for certain Commercial and Industrial Uses.
Section 1: No building permit shall be issued for construction of commercial and
industrial uses on vacant parcels which are estimated by the Community Development Department
of the City of Bullhead City to consume more than 0.3 acre feet per year of water for each parcel
involved, whether such parcels result from lot splits or platted lots, that do not have a prior water
allocation that is adequate to serve the intended use without first obtaining an adequate water
allocation from the City Council of Bullhead City for the development. Allocations shall be based
upon the principle of"first come first served". The new allocation applied for shall represent the
difference between the original water allocation assigned to such parcel and the estimated demand
for water usage resulting from the commercial or industrial development. Any requests for a new
allocation shall be based on an engineer's estimate of water usage for the proposed project approved
Y '
PAGE 2 OF 2
11K 2620 PG 302 FEE495047731
by the community Development Department of the City of Bullhead City. If approved by the City
Council,such allocation will be granted at the time of issuance of the necessary construction permits.
Section 2: No final approval, as defined in Article 3.14, Mohave County Subdivision
Regulations, shall be granted by the Mohave County Board of Supervisors to record any final
subdivision plat within the Contract Service area as depicted on Exhibit "A", until and unless the
subdivider obtains a water allocation for the proposed development from the Bullhead City Council
or their designee. The new allocation applied for shall represent the quantity of water necessary to
serve the platted lots or parcels within the subdivision and shall be calculated using Arizona
Department of Water Resources criteria as follows:
A. Single Family Residential - 250 gallons per day
B. Multiple Family Residential - 200 gallons per day
C. Commercial and Industrial - 0.3 acre feet per year per parcel.
DATED this 21st day of August, 1995.
MOHAVE COUNTY BOARD OF SUPERVISORS
""C/aa__-,t- Se'.74_.:
Pat Holt, Chairman
ovtattuniiiiiiiiii
``ff-14 .1SOfis�0111111111<05,
1-
a Y
•`• ' tfer$. tine Board
OEUS Omoo`
y, Ong
ARl ZONP����```��\`